Enregistrez gratuitement cette image en 800 pixels pour usage maquette (click droit, Enregistrer l'image sous...)
|
|
Réf : S07926
Thème :
Essais - Constructions - Satellites - Sondes - Fusées (2314 images)
Titre : From inside the Payload Changeout Room
Description : (La description de cette image n'existe qu'en anglais)
(03/05/2001) -- From inside the Payload Changeout Room, Launch Pad 39B, a technician monitors the closing of the payload bay doors in Space Shuttle Discovery. Visible is the Integrated Cargo Carrier at top and the Multi-Purpose Logistics Module Leonardo below. Discovery is scheduled to launch March 8 at 6:42 a.m. EST on STS-102, the eighth construction flight to the International Space Station. The primary delivery system used to resupply and return Station cargo requiring a pressurized environment, Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny
|
|